• oo0

    Housing

    Karel Goetghebeurstraat, Oostende

  • oo1

    Housing

    Karel Goetghebeurstraat, Oostende

  • oo2

    Housing

    Karel Goetghebeurstraat, Oostende

  • oo3

    Housing

    Karel Goetghebeurstraat, Oostende

  • oo4

    Housing

    Karel Goetghebeurstraat, Oostende

  • oo5

    Housing

    Karel Goetghebeurstraat, Oostende

  • oo6

    Housing

    Karel Goetghebeurstraat, Oostende

  • oo7

    Housing

    Karel Goetghebeurstraat, Oostende

63 apartments and a common space

The project has 4 separated buildings which makes it possible to create views from and to the park. The buildings are set to leave open views to the existing buildings. The facade on the street is not closed but creates a permeability and the street connects with the inner facades. The terraces are “exterior rooms” which the inhabitant can close with textured glass panels.

  • Location
  • Oostende
  • Size
  • 6930 m2
  • Budget
  • € 10.629.600,00
  • Status
  • Working drawings
  • Type
  • Competition 1st Price
  • Date
  • 2015-...
  • Client
  • De Gelukkige Haard
  • Team
  • Goedele Desmet
  • Ivo Vanhamme
  • Brigitte Pinte
  • External consultation
  • Studieburo Mouton
  • Boydens Engineering