• MABO rooftop volume

    Public Infrastructure

    MABO rooftop volume, Brussels

  • MABO rooftop volume

    Public Infrastructure

    MABO rooftop volume, Brussels

  • MABO rooftop volume

    Public Infrastructure

    MABO rooftop volume, Brussels

  • MABO rooftop volume

    Public Infrastructure

    MABO rooftop volume, Brussels

  • MABO rooftop volume

    Public Infrastructure

    MABO rooftop volume, Brussels

Rooftop Construction

The existing sport infrastructure of the school is expanded with a gymnastic-hall on the roof of the school. The principle of the very light porch structure is used as a structural principle which also defines the form. The skin of the building consists of a fold work of sandwich panels, coated with white zinc. Some triangles are made transparent. On both ends of the hall are large openings with clear glass for extra visibility and a natural ventilation in summer.

  • Location
  • Brussels
  • Size
  • 882 m2
  • Budget
  • € 502.209,00
  • Status
  • Working drawings
  • Type
  • Direct Order
  • Date
  • 2003-...
  • Client
  • Maria-Boodschap Lyceum
  • Team
  • Goedele Desmet
  • Ivo Vanhamme
  • Lotte De Swaef
  • Jean-Michel Culas
  • External consultation
  • RCR studiebureau
  • BAS bvba
  • Daidalos Peutz